Mayfair flat in higher-risk building goes from two years empty to done in 3 months

A client, who owns a two bedroom apartment in Rosebery Court, Charles Street, Mayfair, came to Payte Architects London after a former contractor abandoned the project. The flat had been empty for two years. Rosebery Court is a high rise residential building and so recommencing the works was not just a case of seeking a new builder. Almost all construction work there requires Building Safety Regulator (BSR) approval before it can start and an application can add months to a program. From the first visit to the handover, Jazz led the project.

What we did

Jazz’s first move was to get the route right. Jazz formulated a scope of works and regulatory route so exhaustive, that neither the building surveyor or the management company had reason to refuse it passing all their checks. All electrical and plumbing works were done and signed off by competent person scheme installers, therefore no need for a BSR application. The approval was in place, work commenced immediately and the client no longer had to wait.

Our Creative Director Badrieh Johari styled the interiors with a warm colour scheme of oatmeal, dark oak and sage green. The kitchen includes handleless sage units, marble-effect worktop and splashback to full height. The bathrooms are both completed with large format marble effect porcelain, backlit mirrors and brushed brass fittings. Bespoke dark oak joinery and hidden lighting are found throughout the living room and bedrooms. Jazz ran the works on site, keeping the design, the program and the building’s demands in line from start to finish.

The outcome

In three months we turned the project around. The flat stood empty for two years but is now a finished home, built without a BSR application.

Higher risk buildings and stalled projects are more difficult to re-start than you think. It’s up to the person who picks it up to find out what route the rest of the work can take before anything happens on site. And that was what made three months possible, nailing that up front.

Got a stalled project in a higher risk building?

We take on stalled refurbishments, agree the correct regulatory route and see the work through, all with one team. Reach out to us and tell us about your project or schedule a free 30 minute consultation.